Stake官网

Ropeway Engineering

Ropeway Engineering

Home > SERVICES > Engineering Solution > Ropeway Engineering

Ropeway for Jinsha of Sanqing Mountain in Jiangxi
DATE:16 Nov 2017 浏览次数:1
+ . -

This ropeway was completed in March 2008. It is of the monocable circulating cabinlift type (with detachable grips), with the horizontal distance of 2,460.43 m, elevation difference of 889.5 m, one-way transport capacity of 1,200 people / hour and running speed of 6 m / sec. The ropeway station is well equipped, lines are hidden and architectural form is in coordination with scenic style, which has a relatively small impact on the landscape.

网站地图