Stake官网

Ropeway Engineering

Ropeway Engineering

Home > SERVICES > Engineering Solution > Ropeway Engineering

Ropeway for Zhangjiajie Huangshi Village in Hunan
DATE:16 Nov 2017 浏览次数:1
+ . -

This ropeway was completed in October 1997. It is of the double-cable reversible cabinlift-group type, with the horizontal distance of 868 m, elevation difference of 430 m, one-way transport capacity of 900 people / hour and running speed of 9 m / sec.

Both ends of carrying rope are anchored and tension in wire rope is dynamically monitored, so as to ensure the safe operation of ropeway and reduce the station volume and floor area.

网站地图