Stake官网

Energy & Environmental Engineering

Energy Environmental Engineering

Home > SERVICES > Engineering Solution > Energy & Environmental Engineering

Oxygen Station
DATE:17 Nov 2017 浏览次数:1
+ . -

Achievements in Typical Oxygen Station ProjectsTypical projects:

Project Name

Construction Site

Scale/Supporting

Production Time

Oxygen station expansion and technical modification project of Jinchuan Group Co., Ltd.

Jinchang City, Gansu Province

2×30000 Nm3/h

Under design

Cathode copper project of Qinghai Copper Co., Ltd.

Xining City, Qinghai Province

15000 Nm3/h

Under construction

Modification project for 500 kt/a comprehensive polymetallic ore collection and recovery of Yuanqu Smelter

Yuncheng City, Shanxi Province

12000 Nm3/h

Under construction

Lead and zinc smelting project of Hulunbeier Chihong Mining Co., Ltd.

Hulunbeir City, Inner Mongolia

10000 Nm3/h

Under construction

One million t/a polymetallic ore project of Dongying Lufang Metal Materials Co., Ltd.

Dongying City, Shandong Province

30000 Nm3/h

Ready for production

Comprehensive recycling project of tailings from gold extraction of Shandong Humon Smelting Co., Ltd.

Yantai City, Shandong Province

13000 Nm3/h

2013

100,000 t/a copper smelting project of Yunnan Tin Co., Ltd.

Gejiu City, YunnanProvince

18000 Nm3/h

2011

100,000 t/a anode copper project of Huili Kunpeng Copper Co., Ltd.

Huili County, Sichuan Province

10000 Nm3/h

2010

Oxygen-enriched top blowing project of Jinchuan Group Co., Ltd.

Jinchang City, Gansu Province

2×22500 Nm3/h

2009

Zambia Chambishi Blister Copper Smelter

Zambia Chambishi

12000 Nm3/h pressure swing adsorption

2008

Demonstration project of gold collection in matte with oxygen-enriched bottom blowing of Shangdong Dongying

Dongying City, Shandong Province

10000 Nm3/h

2007

Oxygen Station for Oxygen-enriched Top-blowing Project of Jinchuan Group Co., Ltd.

Design project, located in Jinchang City, Gansu Province, which is under design.

Two sets of 30000 Nm3/h air separation oxygen generating facilities will be constructed in two phases: one set of oxygen generating unit with the oxygen pressure of 1.4 MPa and flow rate of 30000 Nm3/h in the first phase; and one set of oxygen generating unit with the oxygen pressure of 0.05 MPa and flow rate of 30000 Nm3/h in due time of second phase as required by the oxygen consumption schedule.

The scope of process design includes: main plant building of oxygen station within the enclosure wall; outdoor air separation area, molecular sieve purification area, liquid storage area; perlite storehouse, circulating cooling water plant building, as well as pipeline network and support of corresponding input and output products, etc.

Oxygen generating process (first phase): it is a process adopting the full-packed tower technology and full-rectification hydrogen-free argon-generating, which achieves the adsorption by full low-pressure molecular sieve, internal compression of oxygen, middle-pressure expansion of air and entry of expanded air into lower tower, with advantages of reliable technology, advanced process, easy operation, safety and low consumption.

Oxygen generating process (second phase): it is an external compression process adopting the structured packing and full-rectification hydrogen-free argon-generating, with the device purifying air by molecular sieve and equipped with the supercharged expander.

网站地图